MSP Culture Client Assessment Toolkit

Prove what onboarding actually changed.

Baseline every prospect before you propose, show the client the lift after onboarding, and run every QBR around a score they can watch move.

  • Technical + Business assessments
  • 87 scored questions
  • Excel or ScalePad CS
  • White-label ready
  • No macros
The problem

Most MSPs can't show a client what the first 90 days bought them.

Proposals on gut feel

The prospect hears opinions, not findings. Scope gets argued instead of agreed.

Onboarding value nobody sees

You fixed twenty things. The client remembers the one password reset that took too long.

QBRs that are ticket reports

No score, no target, no decisions. Just charts the client didn't ask for.

How it works

One scoring model, three phases, 24 months of proof.

A process guide walks your team through every step, from the first discovery call to the eighth QBR.

Phase 1

Baseline

2 to 3 weeks, before the proposal
  • Both assessments plus an internal fit check
  • Go / no-go on evidence, not hope
  • Onboarding scope traced to At Risk findings
Phase 2

Prove the lift

60 to 90 days after onboarding
  • Before/after by category, with the reason each answer moved
  • Remaining gaps become a 12/24-month roadmap
  • Targets agreed with the client
Phase 3

Move the needle

Every QBR, months 4 to 24
  • Re-score what the roadmap touched
  • Trend line the client can see
  • Full re-assessment every 12 months
See it

Real workbooks, not a slide template.

Screens from the included workbooks, filled in for a fictional dental group. Select any image to enlarge it.

Summary. Maturity score, level and category results, updated as you answer.
Score History. Baseline vs. current and the trend every QBR.
Roadmap. Initiatives ranked by how much they can raise the score.
Two assessments

The technical side and the business side, scored the same way.

Every question has written criteria for each answer, so two assessors score the same client the same way. Every answer records whether it was verified, attested or unknown.

45

Technical Assessment

For the TAM or engineer · verified in the consoles
  • Identity and access
  • Threat protection
  • Backups and DR
  • Endpoint posture
  • Network infrastructure
  • Servers and virtualization
  • Data and productivity platform
42

Business Assessment

For the vCIO or account manager · from interviews and documents
  • Governance and leadership
  • Risk and compliance
  • Policies and procedures
  • Continuity and incident readiness
  • Vendors and third parties
  • People and security culture
  • Technology planning
  • AI readiness

Both map to NIST CSF 2.0 and CIS Controls v8.1 IG1 from one shared mapping, so technical and governance coverage line up category by category.

What's in the box

Everything to run it. Nothing to build.

Editable Word and Excel files, numbered in the order you'll use them. Your logo, your name, your colors.

01

Process Guide

Baseline, re-assessment and roadmap, QBR cadence, operating rules and a launch checklist.

02

Approved Technologies Policy

Supported by the manufacturer and enterprise manageable, with preferred and prohibited lists.

03

Prospect Document Request

The checklist your prospect gets before the leadership interview.

04

Technical Assessment

45 questions, Score History, Roadmap and crosswalks.

05

Business Assessment

42 questions plus an internal Relationship Fit check for deciding whether to take the client.

+

ScalePad CS templates

Both assessments and Relationship Fit, ready to import.

Built for honest scores

A score is only useful while the client believes it.

Evidence before credit

Verified means you saw it. A verbal answer is Client-Attested until proven.

Improvement vs. verification

Report what you fixed separately from what you merely confirmed.

Show regressions

A score that only goes up stops being believed.

Accepted risk is still risk

A signed risk acceptance documents the decision. The gap stays scored.

FAQ

Questions MSPs ask first

Do I need ScalePad CS?

No. The Excel workbooks are complete on their own, with Score History and Roadmap sheets built in. If you use ScalePad CS, import the included templates and plan initiatives there.

Can I put my own brand on it?

Yes. Every file has a short "make it yours" section. Swap in your logo, name and colors. A small "Powered by MSP Culture" credit stays in the footer.

What software does it need?

Microsoft 365 or Excel 2016 and later (LibreOffice works too) and Word. No macros, so nothing for your security tools to block.

Who can use it?

Your whole company, including employees and contractors, with all of your clients. Clients keep the completed deliverables you give them. Reselling or sharing the blank templates outside your company isn't allowed.

Is this a compliance certification?

No. The NIST CSF 2.0 and CIS IG1 crosswalks show alignment. They are not an audit, attestation or certification.

Can you set it up for us?

Yes. I can load the templates into your ScalePad CS, tailor the Approved Technologies Policy to your stack, and calibrate your assessors on two or three of your own clients. Reply to your receipt email to ask.

Client Assessment Toolkit v1.0.1

Give your next QBR a score to move.

Pilot it on two or three existing clients this month, then run Phase 1 on your next prospect.

One MSP license · unlimited clients
$497
  • Two assessments, 87 questions
  • Process guide, policy and prospect request
  • Excel workbooks and ScalePad CS templates
  • White-label, no macros
I want this
Be the first to review
Instant download. Digital product, all sales are final.
Get the toolkit $497